XVis Kickoff Meeting 2014-11-17: Difference between revisions

From XVis
Jump to navigation Jump to search
No edit summary
No edit summary
Line 2: Line 2:
ILE France III boardroom, JW Marriott<br/>
ILE France III boardroom, JW Marriott<br/>
614 Canal St., New Orleans 70130
614 Canal St., New Orleans 70130
<span style="color:red">Note that the times in the agenda are likely to be moved around to accommodate everyone's schedule and conflicts. Let me know if you have any requirements or desires.</span>


{| cellpadding="2" cellspacing="0"
{| cellpadding="2" cellspacing="0"
Line 15: Line 17:
|-
|-
|
|
| &nbsp;&nbsp;&nbsp; PISTON <span style="font-size:smaller; color:#808080">15 minuts</span>
| &nbsp;&nbsp;&nbsp; PISTON <span style="font-size:smaller; color:gray">15 minutes</span>
| Chris Sewell
| Chris Sewell
|-
|-
|
|
| &nbsp;&nbsp;&nbsp; EAVL <span style="font-size:smaller; color:#808080">15 minuts</span>
| &nbsp;&nbsp;&nbsp; EAVL <span style="font-size:smaller; color:gray">15 minutes</span>
| Jeremy Meredith
| Jeremy Meredith
|-
|-
Line 27: Line 29:
|-
|-
|
|
| VTK-m Logistics <span style="font-size:smaller; color:#808080">15 minuts</span>
| VTK-m Logistics <span style="font-size:smaller; color:gray">15 minutes</span>
| Kenneth Moreland
| Kenneth Moreland
|- style="font-size:smaller"
|- style="font-size:smaller"
Line 34: Line 36:
|-
|-
|
|
| Discussion and Milestones <span style="font-size:smaller; color:#808080">15 minuts</span>
| Discussion and Milestones <span style="font-size:smaller; color:gray">15 minutes</span>
|- style="font-size:smaller"
|- style="font-size:smaller"
|
|
| &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 1.a Initial VTK-m Design (SNL, Kitware, ORNL, LANL)
| &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 1.a Initial VTK-m Design (SNL, Kitware, ORNL, LANL)
|}
|}

Revision as of 12:41, 4 November 2014

Monday, November 17, 2014
ILE France III boardroom, JW Marriott
614 Canal St., New Orleans 70130

Note that the times in the agenda are likely to be moved around to accommodate everyone's schedule and conflicts. Let me know if you have any requirements or desires.

9:00 Emerging Architectures
Existing codes
       What should go into VTK-m, what they want from VTK-m, Possible integration issues.
    PISTON 15 minutes Chris Sewell
    EAVL 15 minutes Jeremy Meredith
    Dax 15 minuts Robert Maynard
VTK-m Logistics 15 minutes Kenneth Moreland
       What we have, what is planned, what we need.
Discussion and Milestones 15 minutes
       1.a Initial VTK-m Design (SNL, Kitware, ORNL, LANL)